Concrete estimate template
Every template you can download is the same blank table. The useful part is knowing what goes in the rows — here it is, and here is the version that fills itself in.
The header
Your business name, phone and logo. The client's name and the job address. The date and an estimate number. A validity period, because material prices move and you want the right to requote a job accepted in March off January's numbers.
This section is doing one job: making a homeowner comparing three pieces of paper believe yours came from a real business. It is worth more than most people give it credit for.
The scope, in one short paragraph
Say what you are building in plain words before the numbers: dimensions, thickness, finish, and anything notable like a thickened edge or a broom finish. A client who does not understand the line items still understands this, and it is what they read out to their spouse.
The line items
Each row: description, quantity, unit, amount. For a typical driveway that is ready-mix concrete in cubic yards, crushed stone base in tons, reinforcement in lengths or sheets, base prep in square feet, place and finish in square feet, and forming in linear feet. Excavation and haul-off if they apply.
Quantities and units, not just a price. A row reading 'Concrete — 14.5 yd³' tells the client the number came from measuring their driveway. A row reading 'Materials — $4,200' tells them nothing and invites them to test it against the next bid.
What must NOT appear: your unit costs, your markup, your margin, or your supplier's name. The client is buying a finished driveway, not an audit of your business.
The total, and what sits under it
One total, large. Tax as its own line if you charge it. Then the exclusions — permits, engineered drawings, rock excavation, removal of unsuitable material, landscaping reinstatement — and your payment terms, typically a deposit on scheduling with the balance on completion.
The exclusions are the part people skip and the part that protects you. A single line about rock excavation is the difference between a difficult conversation and an argument.
A template is a blank page, which is the problem with all of them
The structure above is not the hard part. The hard part is doing the take-off, applying your own material costs, adding the right waste, getting markup and margin the right way round, and producing it while the client is still deciding.
That is what BidPour does. You work out the slab on the calculator, tap once, and the quantities arrive as line items priced from your own book, in exactly this structure, as a link your client opens and accepts on their phone. Your first one is free and needs no account; what it costs after that is one price with no per-seat charge.
Work out your own numbers
Send it as a quote, not a number
BidPour turns the quantities into a priced, branded estimate your client accepts from their phone — your material costs, your markup, your logo.
- First quote free, no card, no account
- See the moment they open it
Common questions
What should a concrete estimate template include?
Business details and logo, client name and job address, date and estimate number, a plain-language scope, line items with quantity and unit, a single total, exclusions, and payment terms. Never your own costs or markup.
Should I show my costs on a concrete estimate?
No. Show quantities and a price per line, never what you pay for materials or what markup you applied. Showing quantities proves the number came from measuring the job; showing costs invites a negotiation about your margin.
What should be excluded from a concrete estimate?
Permits, engineered drawings, rock excavation, removal of unsuitable material, utility relocation and landscape reinstatement, unless you have specifically priced them. Naming exclusions is what protects you when the trench hits rock.
Is an estimate legally binding?
In most places an estimate is not a contract, but a signed acceptance of a fixed price often is. State whether the figure is fixed or an estimate subject to change, and give it a validity period — that clarity is what avoids the dispute.