BidPour
Free calculator

Paver Calculator

Paver count with cut waste set by your laying pattern, plus bedding sand and polymeric bags.

Pavers
1,981ea

Herringbone (45°) — 10% cut waste included

Bedding sand
1.67 tons
1 in screed bed
Polymeric sand
5 bags
≈ 90 sq ft per bag at this paver size
Coverage each
0.222 sq ft
Watch out

Herringbone (45°) carries 10% cut waste. Switch pattern and this number moves — it is not a flat 10%.

Your prices, your logo, sent as a link they can accept. First one free, no card.

How to work it out yourself

  1. 1

    Work out the coverage of one paver

    Multiply the paver's width by its length in inches and divide by 144 for square feet. A 4 × 8 paver covers 0.222 sq ft, so a hundred square feet takes 450 of them before any waste.

  2. 2

    Add cut waste for the pattern, not a flat 10%

    Running bond needs about 5%. Herringbone at 45 degrees needs 10%, because every edge is a diagonal cut. Circular and radius work runs 15% or more. Using one number for all of them is why paver orders come up short on herringbone jobs and long on straight ones.

  3. 3

    Bedding sand at one inch

    A one-inch screed bed is standard — thicker beds rut under load. That is area × 1/12 ÷ 27 cubic yards, or roughly 1.35 tons per yard of concrete sand.

  4. 4

    Polymeric sand by joint, not by area alone

    Coverage depends on paver size and joint width, because it is the joints you are filling. Small 4 × 8 pavers with 1/8 inch joints run about 90 sq ft per bag; large-format slabs go 140 sq ft or more.

Worked example: A 400 sq ft patio in 4 × 8 herringbone

Coverage per paver(4 × 8) ÷ 144 = 0.222 sq ft
Pavers before waste400 ÷ 0.222 = 1,800
Herringbone waste (10%)1,800 × 1.10 = 1,980
Bedding sand400 × (1 ÷ 12) ÷ 27 = 1.24 yd³ ≈ 1.7 tons
Polymeric sand400 ÷ 90 ≈ 5 bags

Order 1,980 pavers. The same patio in running bond needs 1,890 — the pattern is worth 90 pavers.

Pattern decides the waste

Every free paver calculator applies a flat 10%. That is wrong in both directions: you overpay on running bond and come up short on herringbone and circular work, which is the one that hurts, because pavers from a second batch rarely match the first. Colour runs vary between production dates and a patched section is visible for the life of the patio. Decide the pattern before you order, not after.

Turn this into a quote your client can accept

You have the quantities. What wins the job is a priced, branded estimate in your client’s hands before the other two bidders get back to them.

  • First quote free — no card, no account
  • Your prices and your logo, saved once
  • See the moment your client opens it
See how it works

Common questions

How many pavers do I need for a 400 square foot patio?

With standard 4 × 8 pavers, about 1,800 before waste. In running bond order roughly 1,890; in herringbone, 1,980. Always order the whole quantity in one batch so the colour run matches.

How much waste should I allow when ordering pavers?

Five per cent for running bond, 10% for 45 degree herringbone, about 6% for basketweave, and 15% or more for circular and radius work. The waste comes from cuts, so the more diagonal edges the pattern creates, the more you need.

How much sand do I need under pavers?

A one-inch screed bed of concrete sand — roughly 1.24 cubic yards, or about 1.7 tons, per 400 sq ft. Do not use a thicker bed to level a poor base; it will rut under load and the pavers will settle unevenly.

How many square feet does a bag of polymeric sand cover?

It depends on joint width and paver size rather than area alone. Small 4 × 8 pavers with 1/8 inch joints run about 90 sq ft per 50 lb bag; large-format slabs with tight joints can reach 140 sq ft or more.

What goes under pavers, sand or gravel?

Both, in order. A compacted crushed-stone base carries the load — 4 to 6 inches for a patio, more for a driveway — with a one-inch screeded sand bed on top for levelling. Sand alone on soil will not hold a patio flat through one winter.

Put this calculator on your own site

Free to use anywhere — a supplier’s resources page, a builder’s blog, a trade forum answer. It works on a phone, needs no account from your visitors, and we will not change it out from under you. All we ask is that you keep the credit line underneath, which is the second half of the snippet.

Copy this
<!-- Paver Calculator by BidPour -->
<iframe src="https://bidpour.com/embed/paver-calculator" title="Paver Calculator"
        style="width:100%;height:780px;border:1px solid #cfcec7;border-radius:4px"
        loading="lazy"></iframe>
<p style="font:14px system-ui;margin:.5em 0">
  <a href="https://bidpour.com/tools/paver-calculator">Paver Calculator</a> by BidPour
</p>
<script>
addEventListener("message",function(e){
  if(e.origin==="https://bidpour.com"&&e.data&&e.data.bidpourHeight)
    document.querySelector('iframe[src^="https://bidpour.com/embed/paver-calculator"]').style.height=e.data.bidpourHeight+"px";
});
</script>